Lahmy Bay 13 kwp Ongrid

A proto Type with 13.7 kwp for the Diving Center

Study for 2 months with impressive results lead to upgrade a complete Solar Power Plant with 650 kwp hybrid system (under study) with diesel generator as a first step towards a First Complete Renewable Energy Resort based in Marsa Alalm – Egypt